Construction method: rolling coating, spraying, brush coating;
Construction environment: temperature >-12 ℃ (non-frosted wall), air relative humidity < 80%, wall moisture content<10%, PH value <10.
Tips:
◎ good paint must be used up within 5 hours, so as not to be wasted beyond the activation period;
◎ paint should be placed in a dry, ventilated place, anti - sun, away from the source of fire;
◎ use 120-200 mesh filter after opening can;
◎ storage and transportation temperature < 350C, temperature >80%.
Storage conditions: sealed storage in a cool dry place at 0-35℃.
Validity period: 18 months
Execution standard: GB/T 9755-2001
Packing specification: 18L