Construction method: rolling coating, spraying, brush coating;
Construction environment: temperature >-12 ℃ (non-frosted wall), air relative humidity < 80%, wall moisture content <10%, PH value <10.
Tips:
◎ good paint must be used up within 5 hours, so as not to be wasted beyond the activation period;
◎ paint should be kept in a dry, well-ventilated place with water and keep away from fire.
◎ use 120-200 mesh filter after opening can;
◎ storage and transportation temperature < 35℃, humidity >80%.
Storage conditions: sealed storage in a cool dry place at 0-35℃.
Validity period: 18 months
Execution standard: GB/T 9755-2001
Packing specification: 18L