Brush painting, roller painting, spraying. Airless spraying is recommended for better effect.
Dilution: 10-20% water dilution, and stir evenly, let stand for 3-5 minutes before construction.
Base surface treatment: base surface must be smooth, solid, dry, clean, neutral, moisture content < 10%.
Construction environment: temperature not less than 5℃, humidity not more than 85%.
Storage conditions: sealed storage in a cool dry place at 0-35℃.
Validity period: 18 months
Execution standard: GB/T 9755-2001
Packing specification: 18L