Construction method: roller coating, brush coating, spraying;
Construction environment: above 8℃, relative humidity less than 85%;
Substrate treatment: the water content of the coated base shall not exceed 10%, and the base surface must be firm, smooth, clean, free from grease and loose substances, and neutral (PH value =7~9).
Clean: after all tools are used, clean them with water.
Notes:
◎ after opening the can, please fully stir the paint in the tank. The construction gap should be covered tightly to prevent coating skinning. The diluted paint cannot be poured back into the original package.
◎ winter construction, recoating time should be appropriately extended; For the wall, winter maintenance time should be appropriately extended to prevent alkaline material precipitation, erosion of the wall;
◎ do not operate when the temperature is lower than 8℃ and the relative temperature is higher than 85%;
◎ please use our company's matching primer to ensure the quality of construction.
Storage conditions: sealed storage in a cool dry place at 0-35℃.
Validity period: 18 months
Execution standard: GB/T 9755-2001
Packing specification: 18L