Substrate treatment:
◎ new wall surface - remove dust, grease and loose ash. If there are pores, repair them in time to ensure the wall is clean, dry and smooth.
◎ heavy coating metope - remove the old wall paint film is not firm, remove dust powder and impurities, leveling, polishing, cleaning and thoroughly dry;
◎ ensure that the surface humidity of pre-coated substrate is 10% lower and the PH value is less than 10;
◎ the surface of pre-coated substrate must be firm, dry, clean, flat and free of loose matter.
Construction method: roller, brush and spray
Construction conditions: please do not work in wet or cold weather (the temperature is below 5℃, the relative humidity is 85%), otherwise the expected effect cannot be achieved. Before construction, the paint should be stirred evenly, and coated with a matching primer. It is forbidden to mix with other coatings.
Maintenance time: 7 days /25℃, low temperature (not low dry 5℃) should be appropriately extended, in order to obtain the ideal paint film effect.
Dilution: according to the construction needs, add less than 10% of water dilution; Stir well before use.
Cleaning: please wash all the appliances with water immediately after the painting stops or finishes.
Storage conditions: sealed storage in a cool dry place at 0-35℃.
Validity period: 18 months
Execution standard: GB/T 9755-2001