Substrate treatment:
◎ remove dust, grease and loose marl from newly built walls. If there are pores, repair them in time to ensure that the walls are clean, dry and smooth.
◎ heavy metope eradication of the old wall is not strong paint film, remove the surface dust powder compounds and impurities, leveling, polishing, cleaning and thoroughly dry;
◎ ensure that the surface humidity of pre-coated substrate is 10% lower and the PH value is less than 10; The surface of precoated substrate must be firm, dry, clean, flat and free of loose matter.
Construction method: roller, brush and spray
Construction conditions:
Please do not work in wet or cold weather (the temperature is below 5℃ and the relative humidity is 85%), or the expected effect will not be achieved. Before construction, the paint should be stirred evenly, and coated with a matching primer. Do not mix with other coatings.
Maintenance time: 7 days /25℃, low temperature (not less than 5℃) should be appropriately extended, in order to obtain the ideal paint film effect.
Dilution: according to the construction needs, add less than 10% of water dilution; Stir well before use.
Cleaning: please wash all the appliances with water immediately after the painting stops or finishes.
Storage: sealed in a cool and dry place at 0-35℃
Validity period: 18 months.
Execution standard: GB/T 9755-2001
Packing specification: 18L