◎ roller coating, brush coating, spraying can be used, airless spraying effect is better.
◎ the base surface must be flat, solid, dry, clean, neutral.
◎ before the construction, the paint should be stirred evenly, and coated with a matching interior wall primer.
◎ dilute with 10-20% water.
◎ do not mix with other paint.
Construction conditions:
◎ the temperature should not be lower than 5℃, the relative humidity should not be higher than 85%, ensure that the wall PH value ≤9.
◎ reapply for more than 2 hours (dry through is the standard).
Storage conditions: sealed storage in a cool and dry place at 0-35℃.
Validity period: 18 months
Standard: GB/ t9756-2001 gb18582-2008
Packing specification: 18L