1. Construction conditions
Construction environment temperature 5 ~ 35℃, humidity in 80% or less is appropriate.
2. Base surface treatment
The base surface must be firm, dry, clean, flat and free from loose substances, ensuring that the water content of the base surface is less than 10% and the PH value is less than 10.
3. Construction process
(1) planar aluminum-plastic plate process:
Base treatment -- scraping guangtian G165 water-based polishing putty -- spraying guangtian 1008 silicone acrylic exterior wall alkali resistant sealing primer -- spraying guangtian G9901 water-based exterior wall fluorocarbon metal paint -- spraying guangtian G9000 water-based fluorocarbon finish varnish
(2) laminated orange peel technology:
Base treatment -- spraying guangtian 1008 silicone acrylic exterior wall alkali resistant sealing primer -- roller coating guangtian 1862 elastic waterproof middle layer paint -- roller coating or spraying guangtian G9901 water-based exterior wall fluorocarbon metal paint roller coating or spraying guangtian G9000 water-based fluorocarbon finish varnish
4. Dilution ratio
Generally no dilution is required. When diluting, use clear water, add no more than 5% water at most, and stir evenly.
5, construction
Roller coating and spraying.
The interval of recoating shall be more than 4 hours (temperature: 25℃, relative humidity: 65% or less). The recoating shall be applied under low temperature and high humidity, and the recoating time shall be appropriately extended.
6. Reference consumption
7 ~ 10m2/ l/time (the consumption varies depending on the effect of the actual construction surface)
Iv. Packing specifications
18kg/ drum (18L)
V. shelf life
Six months at room temperature
Storage and transportation
Sealed and stored in a cool and dry place. Please pay attention to anti-freeze (above 5℃) when storing and transporting.
This product is non - toxic, non - polluting, non - combustible, non - explosive, can be transported as general goods.
Vii. Matters needing attention
When construction should pay attention to maintain air circulation, paint should be away from heat source and direct sunlight for a long time.
In case of eye contact, rinse immediately with plenty of water and seek medical attention.
Children are not allowed to enter the construction area and products should be placed out of reach of children.
Waste disposal should comply with national and local environmental laws and regulations.