New wall: make sure the wall is firm, clean and free of dust, foreign matter and oil. All cracks, peeling place to use the company's external wall putty caulking and leveling. PH < 10. Before formally applying the coating, it is suggested to use our company's matching permeating primer. When spraying construction should pay attention to cover the adjacent wall, so as not to be dirty.
Old wall: if the construction is carried out on the surface of the old wall, the base surface of the wall must be firm and free from oil and foreign matter. Wash the walls with soda solution before construction, and wait for dry before formal construction.
Color: white and many standard colors are available.
Note: during construction, the roller lifts the skin and wrinkles, and then use the roller to repair and shape the surface after 10 minutes
Storage conditions: sealed storage in a cool dry place at 0-35℃.
Validity period: 18 months
Execution standard: GB/T 9755-2001
Packing specification: 18L