◎ brush coating, roller coating or spraying, airless spraying is better. Under normal circumstances, two coating, recoating interval time is not less than 2 hours.
◎ dilute 10-20% (quality ratio) of water dilution, fully stir before construction.
Construction conditions:
◎ the temperature should not be lower than 5℃, the relative humidity should not be higher than 85%, ensure that the wall PH value ≤9.
◎ the base surface must be flat, solid, dry, clean, neutral.
◎ too much water does not increase the effective coating area.
◎ before the construction, the paint should be stirred evenly.
◎ for better painting effect, please use our company's interior wall primer. Do not mix with other coatings.
◎ tools are cleaned with water after use.
Storage conditions: sealed storage in a cool dry place at 0-35℃.
Validity period: 18 months
Standard: GB/ t9756-2001 gb18582-2008
Packing specification: 18L
Bc-5001 high quality wall paint